The future of Riverside South
The Future of Living
By 2034, Riverside South is projected to grow to over 25,000 residents, eventually reaching 50–80,000 with full build-out. The LRT station and transit-first vision will drive denser, walkable neighbourhood pockets with lasting investment upside.
🚄 1. Limebank Station & Line 2 Extension
Officially opened Jan 6, 2025, Limebank O‑Train Line 2, providing convenient travel to downtown, Carleton U, the Airport, and all transit connections along the way. Train frequency every 12 minutes Monday to Friday.
Monday to Friday: 6 am — midnight
Saturday: 6:30 am — midnight
Sunday: 7:30 am — 11:30 pm
It’s elevated, fully accessible, with cycle paths and bus interchange—laying the transit foundation of Riverside South’s future development .
🏬 2. Armstrong Plaza @ Limebank & Earl Armstrong
Summer 2025 marks the debut of Armstrong Plaza, located just across from Limebank Station https://www.urbandalecorporation.com/retail/armstrong-plaza
The campus includes ~12 retail/office units, (McDonald’s, Starbucks, Baskin-Robbins), plus local boutiques, services, fitness studios, clinics—and more.
With ground-up construction underway, this plaza is set to become Riverside South’s commercial heartbeat.
🛒 3. Limebank Centre – Major Retail Hub
Adjacent to the LRT, the 16-acre Limebank Centre (1420 Earl Armstrong Rd) is planning 213,000 sq ft of shopping space.
Anchored by a 49,000 sq ft grocery store, it’s framed to include banks, eateries, fitness and essential services—all in downtown-accessible proximity.
🌆 4. The Square – A Vibrant Town Centre in the Making
“The Square” is the visionary core around Limebank Station—envisioned as a mixed-use, pedestrian‑friendly hub with residences, offices, shops, eateries, and public plazas.
Though timelines are TBD, it’s the beating heart of future community life, merging transit, living, and leisure.
🏙 5. Riverside South Business Park & Transit-Oriented Growth
Just 1.8 km from Limebank Station, the Business Park offers commercial lots (1.5–45 acres) for offices, light industry, and creative enterprises myriversidesouth.com+1urbandalecorporation.com+1.
A newly approved Secondary Plan (June 2025) charts a massive development vision: 1,400+ homes, 9,000 jobs, a school, library, community centre, parks, and BRT connections integrating with LRT ontarioconstructionnews.com.
🏫 6. New Secondary School – Community Anchor
Funded by the OCDSB, a new Riverside South secondary school (Grades 7–12, ~1,500 students) is under construction at Spratt & Earl Armstrong, slated to open Fall 2025.
This landmark is embedded in the Armstrong Plaza/masterplan area, reinforcing the emerging town centre ecosystem.
Riverside South is transitioning from a quiet suburban enclave to a vibrant, self‑contained town centre, centered on Limebank LRT, Armstrong Plaza, and the upcoming Square. These developments—complemented by a new high school, business park, retail hub, and civic spaces—are weaving the fabric of a modern, walkable, and community‑driven urban village.
Soon, Riverside South won’t just be a place to live—it’ll be somewhere to belong, thrive, and grow.
Featured neighbourhood listing
208 Poplin Street